About

About the project

The Bertha Street Outfall Extension project is now complete!

This project aimed to address water ponding and flooding issues in the Bertha Street area. These issues were caused by sand blockages at the main outfall located at Picnic Point Beach.

This work focused on extending the outfall to improve its water flow capacity and alleviate the flooding and upwelling issues.

Key Works Included:

Increasing the drainage capacity of the outfall, helping to manage stormwater more effectively and preventing flooding during heavy rain events. Length of outfall was increased by 60 meters.